Lámer, Géza2020-09-112020-09-112018-07-07International Journal of Engineering and Management Sciences, Évf. 3 szám 3 (2018) , 324-343https://hdl.handle.net/2437/295158Building under roof and/or floor upbuilding raises technical issues different as one raise in the case of green investments. Primarily, depending of system of building constructions of the existing building there is a possibility to build under roof, and/or floor upbuilding. In the paper we review those technical issues, what decide, that in the case of given building there is or not possibility to build under roof, and/or floor upbuilding. We examine in general, that in the case of building under roof, and/or floor upbuilding what building process should be considered, and what kind of time and financial scheduling is advisable to prescribe. We will present a case study, that the inadequate processing of technical issues may require time and financial rescheduling.A tetőtérbeépítés és/vagy emeletráépítés a zöldberuházástól eltérő műszaki kérdéseket vet fel. Elsősorban a meglévő épület épületszerkezeti rendszerének függvényében van lehetőség a tetőtérbeépítésre és/vagy emeletráépítésre. A tanulmányban áttekintjük azokat a műszaki kérdéseket, amelyek eldöntik, hogy az adott épület esetén lehetséges-e a tetőtérbeépítés és/vagy emeletráépítés. Megvizsgáljuk általánosságban, hogy egy tetőtérbeépítés és/vagy emeletráépítés során milyen építési folyamatokkal kell számolni, és hogy milyen időbeli és pénzügyi ütemezést célszerű előírni. Egy esettanulmány ismertetésével mutatjuk be, hogy a műszaki kérdések nem kellően alapos feldolgozása szükségessé teheti az időbeli és pénzügyi átütemezést.application/pdftetőtérbeépítés és/vagy emeletráépítés műszaki kérdései és azok hatása a pénzügyi és időbeli ütemezésérefolyóiratcikkOpen Accessby the authorshttps://doi.org/10.21791/IJEMS.2018.3.27.International Journal of Engineering and Management Sciences332498-700X