<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">

Value Stream Management in Cleanroom Construction under Lean Engineering Framework

Betöltés ...
Bélyegkép

Fájlok

Dátum

Authors

Folyóirat címe

Folyóirat ISSN

Kötet címe (évfolyam száma)

Kiadó

DOI

Absztrakt

this thesis investigates inefficiencies in cleanroom construction projects for lithium-ion battery plants from a Lean Engineering perspective. The research focuses on how disruptions in information flow, design coordination, and stakeholder interfaces create waste throughout the project lifecycle. Using a qualitative case study approach, I analyzed four real project cases from a European battery factory, including requirement clarification, BOQ accuracy, ceiling constructability, and design modifications during construction. Through Value Stream Mapping, I identified three major types of waste: rework, waiting, and coordination inefficiencies. The study found that these problems are mainly caused by fragmented information, insufficient interface management, and the fast-track delivery model. Finally, Lean-based optimization strategies were proposed to improve workflow continuity, reduce non-value-added activities, and enhance project performance in future cleanroom construction projects.

Leírás

Forrás

Jóváhagyás

Áttekintés

Kiegészítve

Hivatkozik rá

Jogok és engedélyezések

Hozzáférhető a 2022 decemberi felsőoktatási törvénymódosítás értelmében.