Value Stream Management in Cleanroom Construction under Lean Engineering Framework
| dc.contributor.advisor | Mátrai, Norbert Zoltán | |
| dc.contributor.author | Li, Han | |
| dc.contributor.department | DE--Műszaki Kar | |
| dc.date.accessioned | 2026-06-09T07:04:58Z | |
| dc.date.available | 2026-06-09T07:04:58Z | |
| dc.date.created | 2026-05-30 | |
| dc.description.abstract | this thesis investigates inefficiencies in cleanroom construction projects for lithium-ion battery plants from a Lean Engineering perspective. The research focuses on how disruptions in information flow, design coordination, and stakeholder interfaces create waste throughout the project lifecycle. Using a qualitative case study approach, I analyzed four real project cases from a European battery factory, including requirement clarification, BOQ accuracy, ceiling constructability, and design modifications during construction. Through Value Stream Mapping, I identified three major types of waste: rework, waiting, and coordination inefficiencies. The study found that these problems are mainly caused by fragmented information, insufficient interface management, and the fast-track delivery model. Finally, Lean-based optimization strategies were proposed to improve workflow continuity, reduce non-value-added activities, and enhance project performance in future cleanroom construction projects. | |
| dc.description.course | LEAN Engineer | |
| dc.description.degree | MSc/MA | |
| dc.format.extent | 45 | |
| dc.identifier.uri | https://hdl.handle.net/2437/408085 | |
| dc.language.iso | en | |
| dc.rights.info | Hozzáférhető a 2022 decemberi felsőoktatási törvénymódosítás értelmében. | |
| dc.subject | Lean Engineering | |
| dc.subject | Value Stream Management | |
| dc.subject | Cleanroom Construction | |
| dc.subject | Construction Waste | |
| dc.subject | Fast-Track Project Delivery | |
| dc.subject.dspace | Engineering Sciences | |
| dc.title | Value Stream Management in Cleanroom Construction under Lean Engineering Framework | |
| dc.title.subtitle | A Study of European Lithium Battery Plants |
Fájlok
Eredeti köteg (ORIGINAL bundle)
1 - 1 (Összesen 1)
Betöltés ...
- Név:
- Han_Li_THESIS.pdf
- Méret:
- 1,44 MB
- Formátum:
- Adobe Portable Document Format
Engedélyek köteg
1 - 1 (Összesen 1)
Betöltés ...
- Név:
- license.txt
- Méret:
- 1,69 KB
- Formátum:
- Item-specific license agreed upon to submission
- Leírás: