From Push to Pull: Lean Tool Integration on a Simulation-Based Assembly Line
| dc.contributor.advisor | Deák, Krisztián | |
| dc.contributor.author | Abdelhakim Abdelrazek Mohamad Hamza, Mirna | |
| dc.contributor.department | DE--Műszaki Kar | |
| dc.date.accessioned | 2026-06-09T08:24:45Z | |
| dc.date.available | 2026-06-09T08:24:45Z | |
| dc.date.created | 2026-05-15 | |
| dc.description.abstract | the implementation of Value Stream Mapping (VSM)-based Lean manufacturing approaches that have been in a simulated context of an assembly line. The discussions were: (A) push/batch production system baseline, (B) SMED with one-piece flow, and (C) changing the floorplan’s layout and using Value Stream Mapping. The system with Integrated Lean processes resulted in up to 83.55% shorter lead times, with changeover times reduced to 30%, and with a reduced distance walked by Operators too. This thesis presents a synthesized manufacturing line that uses other research papers to base production, parameters and lean methods on. It includes a (spaghetti diagram) walk-distance metric, a value stream map comparison and lead time change in two systems. | |
| dc.description.course | LEAN Engineer | |
| dc.description.degree | egységes, osztatlan | |
| dc.format.extent | 42 | |
| dc.identifier.uri | https://hdl.handle.net/2437/408101 | |
| dc.language.iso | en | |
| dc.rights.info | Hozzáférhető a 2022 decemberi felsőoktatási törvénymódosítás értelmében. | |
| dc.subject | VSM | |
| dc.subject | SMED | |
| dc.subject | Push to pull | |
| dc.subject | Lean systems | |
| dc.subject.dspace | Engineering Sciences | |
| dc.title | From Push to Pull: Lean Tool Integration on a Simulation-Based Assembly Line |
Fájlok
Eredeti köteg (ORIGINAL bundle)
1 - 1 (Összesen 1)
Betöltés ...
- Név:
- Mirna_AbdelhakimHamza_THESIS .pdf
- Méret:
- 1,44 MB
- Formátum:
- Adobe Portable Document Format
- Leírás:
- the implementation of Value Stream Mapping (VSM)-based Lean manufacturing approaches that have been in a simulated context of an assembly line. The discussions were: (A) push/batch production system baseline, (B) SMED with one-piece flow, and (C) changing the floorplan’s layout and using Value Stream Mapping. The system with Integrated Lean processes resulted in up to 83.55% shorter lead times, with changeover times reduced to 30%, and with a reduced distance walked by Operators too. This thesis presents a synthesized manufacturing line that uses other research papers to base production, parameters and lean methods on. It includes a (spaghetti diagram) walk-distance metric, a value stream map comparison and lead time change in two systems.
Engedélyek köteg
1 - 1 (Összesen 1)
Betöltés ...
- Név:
- license.txt
- Méret:
- 1,69 KB
- Formátum:
- Item-specific license agreed upon to submission
- Leírás: