tetőtérbeépítés és/vagy emeletráépítés műszaki kérdései és azok hatása a pénzügyi és időbeli ütemezésére

Dátum
2018-07-07
Folyóirat címe
Folyóirat ISSN
Kötet címe (évfolyam száma)
Kiadó
Absztrakt

Building under roof and/or floor upbuilding raises technical issues different as one raise in the case of green investments. Primarily, depending of system of building constructions of the existing building there is a possibility to build under roof, and/or floor upbuilding. In the paper we review those technical issues, what decide, that in the case of given building there is or not possibility to build under roof, and/or floor upbuilding. We examine in general, that in the case of building under roof, and/or floor upbuilding what building process should be considered, and what kind of time and financial scheduling is advisable to prescribe. We will present a case study, that the inadequate processing of technical issues may require time and financial rescheduling.


A tetőtérbeépítés és/vagy emeletráépítés a zöldberuházástól eltérő műszaki kérdéseket vet fel. Elsősorban a meglévő épület épületszerkezeti rendszerének függvényében van lehetőség a tetőtérbeépítésre és/vagy emeletráépítésre. A tanulmányban áttekintjük azokat a műszaki kérdéseket, amelyek eldöntik, hogy az adott épület esetén lehetséges-e a tetőtérbeépítés és/vagy emeletráépítés. Megvizsgáljuk általánosságban, hogy egy tetőtérbeépítés és/vagy emeletráépítés során milyen építési folyamatokkal kell számolni, és hogy milyen időbeli és pénzügyi ütemezést célszerű előírni. Egy esettanulmány ismertetésével mutatjuk be, hogy a műszaki kérdések nem kellően alapos feldolgozása szükségessé teheti az időbeli és pénzügyi átütemezést.

Leírás
Kulcsszavak
Jogtulajdonos
by the authors
URL
Jelzet
Egyéb azonosító
Forrás
International Journal of Engineering and Management Sciences, Évf. 3 szám 3 (2018) , 324-343
Támogatás