Analysis of Activity Times in the Process of a Wooden Box Manufacturing

dc.contributor.authorPusztai, László
dc.contributor.authorKocsi, Balázs
dc.contributor.authorBudai, István
dc.contributor.authorNagy, Lajos
dc.date.accessioned2020-09-11T07:16:54Z
dc.date.available2020-09-11T07:16:54Z
dc.date.issued2018-09-30
dc.description.abstractThe main target of companies is to earn money and achieve profit. In order to fulfil these needs, companies have to reduce their costs. Cost reduction is often associated with bad quality products, but it could be done in a different way. Sometimes it is enough to examine only their own processes and then benefit from the process optimization, process improvement or process scheduling. In this article a case study is presented, in which the differences in a production scheduling are evaluated with the application of Monte-Carlo simulation and descriptive statistics. At the end of the paper the most efficient material sequence is selected at the manufacturing company by using weighted sum modelen
dc.formatapplication/pdf
dc.identifier.citationInternational Journal of Engineering and Management Sciences, Vol. 3 No. 4 (2018) , 475-484
dc.identifier.doihttps://doi.org/10.21791/IJEMS.2018.4.39.
dc.identifier.eissn2498-700X
dc.identifier.issue4
dc.identifier.jtitleInternational Journal of Engineering and Management Sciences
dc.identifier.urihttps://hdl.handle.net/2437/295203en
dc.identifier.volume3
dc.languageen
dc.relationhttps://ojs.lib.unideb.hu/IJEMS/article/view/5102
dc.rights.accessOpen Access
dc.rights.ownerby the authors
dc.titleAnalysis of Activity Times in the Process of a Wooden Box Manufacturingen
dc.typefolyóiratcikkhu
dc.typearticleen
Fájlok
Eredeti köteg (ORIGINAL bundle)
Megjelenítve 1 - 1 (Összesen 1)
Nincs kép
Név:
pdf
Méret:
787.43 KB
Formátum:
Adobe Portable Document Format